The contract 066/19-OB signed with the EBRO HYDROGRAPHIC CONFEDERATION (Directorate General for Water, Secretary of State for the Environment, Ministry for Ecological Transition), had an execution period of 27 months.
The aim of the project was to implement a system to control the possible effect of induced seismicity produced by the Enciso reservoir on the river Cidacos.
The scope of the project was as follows:
The contract has included a maintenance service to guarantee the continuity of the system’s operation and the arrival of seismic data in real time to the reception centres, and a seismological analysis service based on the data generated by the network, with the collaboration of the University of Alicante.
This project completes the set of control and safety systems that EPTISA’s Dam Monitoring and Surveillance Area has installed and implemented at the Enciso dam over the last few years, including the Automated Monitoring System with more than 600 sensors and the implementation of the dam’s Emergency Plan with five warning points with electronic sirens.